Jan
Stainless Bird Toys @ Blu's Bird Toys
Vendor
Avenue Veteran
Celebirdy of the Month
Mayor of the Avenue
Avenue Spotlight Award
Avenue Concierge
Well, heck when I closed on Dec. 9th for my time off for Christmas closure all was okay on the 9th then on Sunday early morning of the 11th, we had very strong winds and then rain with hubby waking me up at 5:30 am saying the kitchen floor was covered in water. Needless to say, it took all the roofing off down to the bare plywood on the south side of the house. So we had lots of leaks all around. Finally after 4 days or so the roofer was able to come here and got it tarped. We still have leakage. They may start on the roof in the next couple of days if weather holds. I am bummed out that the roof thing happened, it is going to cost a bundle.
Anyway, I had planned originally to open on Jan. 9th but now I have it for Jan. 16th. I have all my toy things covered under a couple pieces of 9' x 12' plastic in the room. In the mean time I've been working on prepping stainless steel parts that need cut, drilled and what not so they are ready for toy building. I still want to get more stainless metal finished before opening up.
Anyway, I had planned originally to open on Jan. 9th but now I have it for Jan. 16th. I have all my toy things covered under a couple pieces of 9' x 12' plastic in the room. In the mean time I've been working on prepping stainless steel parts that need cut, drilled and what not so they are ready for toy building. I still want to get more stainless metal finished before opening up.